1. Home
  2. Projects
Project inventory

New and off-plan projects

428 rows tracked6 emiratesPopulation by emirate

Every project we hold, emirate by emirate. Abu Dhabi is being populated first, then Sharjah, Ajman, Umm Al Quwain and Ras Al Khaimah, with a selected set of Dubai developers last.

428project rows
212attributed to a named developer
196awaiting attribution
20Dubai slots pending selection

By emirate

Where the inventory sits today, and how much of it is attributed.

EmirateProject rowsAttributedNamed developersStage
Abu Dhabi1497930Stage 5 — first
Sharjah1263012Stage 6
Ajman1965Stage 7
Umm Al Quwain18183Stage 7
Ras Al Khaimah967940Stage 8
Dubai2000Stage 9 — selection pending
Figures come straight from the inventory sheet (REF_Invest_UAE_Project_Control, 20.08.2026), not from estimates. “Attributed” means the row carries a named developer rather than the Developer to verify placeholder. Closing that gap is Stage 4 work and it is on the critical path for everything after it.

Browse another way

Looking for something specific?

Tell us the emirate, the budget and the timeline. We will come back with the projects that fit — including the ones not yet on the site.

Talk to an advisor